Electrical: Energy Meter Replacement single phase

s your energy meter malfunctioning, over-reading, or outdated? A faulty meter can affect your billing and cause safety risks. At Sajilo Sewa, we offer professional single phase energy meter replacement services in Kathmandu, Bhaktapur, and Lalitpur — ensuring your electrical system stays safe, compliant, and accurate. Our certified electricians handle disconnection, replacement, and reconnection following standard safety protocols. ⸻ 🔧 Service Includes: • Disconnection of the old single phase meter • Installation of new single phase meter (client-provided or arranged upon request) • Wiring reconnection and tightening • Load testing and energy flow verification • Final safety check ✅ 30-day service warranty ❓ Frequently Asked Questions (FAQ) Q1: Do you provide the new energy meter? A: No, the meter should be arranged by the customer. We can suggest NEA-approved vendors if needed. Q2: Is this service approved by NEA? A: We provide technical meter replacement only. NEA authorization or billing update must be handled separately with their office. Q3: Will power be cut off during replacement? A: Yes, a temporary disconnection is required for safe installation. The process is usually completed within 30–60 minutes. Q4: Is the service safe for old buildings? A: Yes, our team checks all wires and fittings before reconnecting to ensure safety. Q5: Can I replace a burnt or damaged meter with this service? A: Yes, we handle damaged or outdated meter replacements, but any structural electrical issue will be assessed first. 👉 Book now to replace your faulty or outdated energy meter with safe and expert service in Kathmandu!

Reviews (0 reviews for this service)
0.0
5 Stars
(0)
4 Stars
(0)
3 Stars
(0)
2 Stars
(0)
1 Stars
(0)

Book a Service

Price
Rs. 500.00 / Hour
Select Date

Mon, Jun 30

Choose a time period

Team will arrive within the selected time

Promo Code